The Flour Mill Phase III project, built by Angola Construction Company, started on December 11, 2023 and lasted five months of work before being successfully topped out in early May of this year. The project mainly contains No. 6 and No. 11 projects, No. 6 is a flour milling workshop, the workshop is divided into five floors of slabs with a height of 23.5 meters and more than four hundred square feet per floor, which belongs to the steel and concrete structure, with a large number of pre-prepared holes, direct concrete closing, no secondary structure, high requirements for the protection of finished products, and has to be finished in one go.
Project No. 11 is a bran silo, pure reinforced concrete structure, cylindrical, with a total height of 21 meters, with high technical requirements for workers' construction, no error in the data of reserved holes, 30cm thickness slab wall, and stereotyped steel template construction, which requires high verticality and high sealing. Guangjin team after unremitting efforts, continued to fight for several days, the flour mill project is now successfully completed acceptance, the construction of the project also drew a successful conclusion. The next step is that the whole plant will enter the formal production and operation stage, and the completion and commissioning of the project will further improve the level of protection of the local people's basic life.
Angola Flour Mill Phase III Project is the flour mill construction project of GRANOFINO, LIMITADA in which Guangjin Construction participated as an engineering contractor. With a high quality project, Guangjin Construction has won the owner's high recognition. Guangjin team will take advantage of the momentum, fight for the third quarter, maintain the running posture, breakthroughs, and move forward steadily.